ABOUT THE COMPANY
Services and products
Projects
SUSTAINABLE DEVELOPMENT
Press-center
Contacts
en
ru
all
sites
MENU
8 (843) 572-09-99
fax:
8 (843) 572-09-99
ABOUT THE COMPANY
General
Management
Structure of the Holding
Innovative activities
History
Presentations and company prospects
Services and products
General
Engineering and design
Construction and repair
Electric power & heat generation
Fiber-optic communication line installation
Projects
On map
Main projects
Reference list
Recommendations
SUSTAINABLE DEVELOPMENT
General
Integrated management system
Environmental responsibility
Safety and labor protection
Press-center
General
News
Photo gallery
Contacts
all sites of the holding
Engineering and design
IED- INEL
Branch TatNIPIenergoprom
TatBelEnergoProject
EC EnergoDevelopment
Novosibirskenergyproject
Construction, installation, repair, service
IED - Engineering
M12 Systems
IED-KER (KamEnergoRepair)
IED-Montazh
IED-Promstroy
Power and heat supply
IED - Generation
Branch Zelenodolsk Heat Supply Company
Branch Elabuga Heat Supply Company
Equipment manufacturing
ServiceMontageIntegratcia
TNPP RU - Engineering
IED-Energy
KamEnergoMash
Back to the list
Main
Projects
Main projects
Complex of petrochemical and oil refinery plants for JSC TANECO
Complex of petrochemical and oil refinery plants for JSC TANECO
Location
Russia, Nizhnekamsk
Customer
TANECO
Realization time
2008-2010
Completed work
Development and design of external electric power supply system and of power distribution scheme of its own power source
Automated system of consumption and distribution of electricity
Design of heat supply system
Installation of technological and auxiliary equipment
Erection of steel structures (buildings, constructions, reservoirs, etc.)
Pipelining (technology, gas, steam and hot water pipelines)
Installation of engineering systems
Commissioning and start-up works
Previous project
Kazan power plant-3
Modernization and construction of 386 MW gas turbine unit
Next project
Schelokov Substation 500 kV
Turnkey construction of 500 kV Substation
Do you need to
implement a similar project?
Connect to us
Connect to us
I agree to my personal data processing under Article 9 of Federal Law N152-FZ “On Personal Data” dated July 27, 2006
Mail